Reliable Construction Services arrives early to start framing out the new deck for Brett and his family. Concrete was set the night before to help support the new larger posts. Work was moving fast. Before you knew it, all the posts were set and flashing was going up. All the while, Brett and his family continue to watch from inside with amazement and their dog, Patch, shakes with excitement. By day's end, a majority of the decking had been set. Things were coming together. All that was left was the ramps, some stairs and railing. Scroll through the pictures below to watch the progress.

  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide